Sign In | Join Free | My lightneasy.org
China AARE CUN TAI THERMAL LTD. logo
AARE CUN TAI THERMAL LTD.
Living by sincerity, diligency and efficiency
Active Member

8 Years

Home > Welded Finned Tubes >

Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler

AARE CUN TAI THERMAL LTD.
Contact Now

Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler

Brand Name : JYCT

Model Number : HH-10

Certification : ISO9001:2008 authorized by SGS

Place of Origin : JIANGSU,CHINA

MOQ : 2000kgs

Price : Negotiable

Supply Ability : 50 tons per day

Delivery Time : Within 50 days after received your deposits

Packaging Details : as per export packing standard, custom packing is available

Year Established : 2008

Material : Stainless Steel+Stainless Steel, Carbon Steel+Carbon Steel, Alloy+Alloy etc.

Payment Terms : T/T in Advance, or Irrevocable L/C at Sight

Size : Customer's Drawing

Bare Tube OD : 25-63mm

Fin Pitch : 8-30mm

Contact Now

HH fin tube apply in waste heat recovery , boiler



Application: waste heat recovery, petrochemical industry, power plant boiler, economizer, coaches, civil building heating, refrigerating, drying, medicine of wood drying, food drying system and other industries

Capacity: Six DC ERW H/HH fining lines, daily capacity around 20 tons;

Base tube material: SA192 SMLS 31.8mmOD*3.2mmTHK*3900mmLG
Fin Material: CS; FPM53fins X 3mm THK x 75 mm W x 152mm H

Manufacturing Process:
It adopts high frequency welding spiral technology, the national patent technology with high frequency power supplies as the heat source to heat the steel strip, steel pipe at the same time,be welded together


Material:
Steel, Carbon Steel, etc.
Bare tube OD: 25-63mm Fin Pitch: 8-30mm Fin Height: <200mm Fin Thick: 1.5-3.5mm

Name

Base tube
(OD) mm

Fin Pitch
(mm)

length
(m)

Min Max Min Max Min Max
Extruded aluminum fin tube 12.7 51 2.1 10 0.5 20
L/LL/KL aluminum fin tube 19 51 2.1 3.2 0.5 15
Embedded aluminum fin tube 19 42 2.3 3.2 0.5 15
Low fin tube 12.7 32 0.8 2 0.5 20
Spiral fin tube 12.7 70 0.5 20
ERW HF spiral fin tube 16 219 3 25 0.5 28
ERW HF spiral serrated fin tube 16 219 3 25 0.5 28

Serrated width(mm)
10 min~26 max

Serrated depth(mm)
4 min~16 max

ERW studded tube 89 200 16 50 2 15
DC ERW H/HH fin tube 25 51 9 25 1 15
H/HH fins

Length(mm)
60 min-150 max

Thickness(mm)
1.5 min~4 max

Width(mm)
30 min~50 max


Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / BoilerDescription:

General Manufacturing Process: The fin strip is welded continuously and spirally wound onto a polished bare tube. And the tube and fins are bonded together by using high frequency resistance welding technique.

We produce both solid plain and serrated helical welded steel finned tube. And also, all spiral welding tubes could be bent in the middle or at the end of fin tubes, we call it Hairpin tubes.

Products&Inspection Deatails:


Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler



Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler


Following documentations should be reviewed & endorsed:
1. Declaration of conformity,
2. Inspection plan,
3. Welding book(WPS & PQR),
4. Finned tubes examination reports
(dimension & visual inspection, hardness test report, tensile test report),
5. Test samples sheet,
6. Incoming inspection report,
7. Inspection certificate for bare tube,
8. Quality test certificate for steel strip,
9 .Iinspection & Guarantee certificate for finned tube,
10. Product inspection report.


Packaging: sea worthy with plastic cap for each edge of core tube , finned tubes shall be put on the metal frame with wooden walls and plastic layer be considered between tubes rows to avoid damage and deformation of the fins
Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler



Mass production of DC ERW HH fin tube

Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler


FAQ

About our company
A------ We have three company,
1. Aare Cun Tai Thermal Co., Ltd (Hong Kong, China)
2. Jiang Yin Cun Tai Thermal Equipment Co., Ltd (Jiangsu, China)(Mill)
3. Jiang Yin Aare International Trading Co.,Ltd. (for export procedure)
Besides the companies above mentioned, we don’t have any other name.

About Our main business
A------ DR(Extruded) / L(Wrapped) / LL(Overlapped) / KL-KLM (Knurled) / G(Embeded) Fin Tube;
High Frequency Welding Fin Tube,Studded Tube, H/HH/Square Fin Tube,Longitudinal Tube;
Elbows, Low Fin Tube,Spiral Tube, U bend , Corrugated Tube.

About Price terms
A------ It could be EXW, FOB,CIF,CNF

About Payment Term
A------ We usually accept payment by T/T in advance or by L/C available against draft at sight

About Lead Time
A------ Usually it takes about 35-45 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.

About Quality Control
A----
Incoming inspection report for bare tube/alu.tube / alu. strip / steel strip
Mill test cetification for bare tube
Mill test cetification for fin (alu.tube / alu. strip / steel strip)
Mill test cetification for finned tube
Finned tubes dimension & visual inspection reports


About Sample
A--- If you are interested in our above products, please contact us.
We can provide small samples in store for you, and you are welcome to visit visit our factory

Our moulds can be customized,you could kindly leave an inquiry to know more details about price, packing and shipping.




Product Tags:

steel fin tube

      

welded fin tubes

      
Buy cheap Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler product

Steel Longitudinal HH Welded Finned Tubes For Waste Heat Recovery / Boiler Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: AARE CUN TAI THERMAL LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)